"We need to re-evaluate the seismic design values for the OCONUS site," Elias said, his voice tight. "Section 1-3.1 has been updated, and our current RFP doesn't reflect the new risk levels."
By the time the team reached , the atmosphere in the room was electric with tension. They were deep into the Code Compliance Plans , mapping out the fire department access and line of encroachment. This Time [Chapter 1-3.1]
The terminal blinked with a steady, rhythmic pulse. of the Structural Code was open on Elias’s screen—the section on seismic design values that he had ignored three years ago. Back then, he had signed off on the OCONUS installation project without double-checking the UFC 1-200-01 standards. "We need to re-evaluate the seismic design values