: An adequate exhaust system must be functioning; failure to vent the foreline pump and spray chamber separately will void the warranty.
: Use the Agilent Site Preparation Checklist to verify all supplies and utilities are ready. 2. System Checkout and Conditioning
: Utilize SWARM (Automated System Tuning) to verify sensitivity, mass accuracy, and resolution. 4. Software and Data Analysis 6546.mp4
: The system must be located within 2.5 meters (8 feet) of the power outlet.
: Use LCMS-grade deionized water with 0.1% formic acid (Channel A) and 100% LCMS-grade acetonitrile (Channel B). : An adequate exhaust system must be functioning;
: Requires one or two dedicated 15 Amp 200-240V AC outlets.
The system is managed through software:
: Install 1 liter of 100% LCMS-grade deionized water (Channel A) and 1 liter of 100% LCMS-grade methanol (Channel B).